SP-FORUMS
http://sp-forums.com/

Changing patch assign
http://sp-forums.com/viewtopic.php?f=19&t=8034
Page 1 of 1

Author:  Dj_just_jeff [ Fri Jun 18, 2010 1:36 am ]
Post subject:  Changing patch assign

Yo phe, olby and everyone else:

I have some samples loaded in a patch and i want to move samples from one pad to another in the same patch. I have been trying to fig it out and looked through the manual, cant find it. Any advice? Thanks in advance guys.

Author:  Olby [ Mon Jun 21, 2010 3:15 am ]
Post subject:  Re: Changing patch assign

Use the clipboard function. Hold the pad which you want to copy and hit clipboard. Afterward whenever you hold the clipboard button and hit any pad it will copy the contents of the clipboard to the specified pad. Clipboard will hold the copied sample and parameters as long as the red light is on.

Author:  Dj_just_jeff [ Tue Jun 22, 2010 10:14 pm ]
Post subject:  Re: Changing patch assign

Thank you olby.

Page 1 of 1 All times are UTC
Powered by phpBB © 2000, 2002, 2005, 2007 phpBB Group
http://www.phpbb.com/